Vitya Labsexperiment / prototype
Open the lab

Independent project laboratory

Ideas get working versions here.

Vitya Labs is the shelf for useful experiments: community concepts, visual tools and AI-assisted oddities that were too interesting to leave as notes.

Current experiments

The workbench.

Five live ideas ranging from community workflows to delightfully specific AI and optimisation tools.

05 PROJECTS
GrillHub interface

Community BBQ platform

GrillHub

Events, recipes, invitations, friends and shopping lists meet in one workflow for organising cook-outs.

React 19Spring BootFastAPI AI
Hálózó network and Gantt interface

CPM network & Gantt scheduler

Hálózó

Draw a construction schedule as a network; the critical path and Gantt chart recompute with every edit.

React FlowCPM engineExpo
TOTO lost animal reporting interface

Track Others Together Outside

TOTO

A mobile-first community map for reporting and finding lost, found and stray animals.

React NativeGeolocationSpring Boot
Shopper24 store route interface

Shopping route optimiser

Shopper24

Turns a raw shopping list into a category-sorted route and explains it on a visual store map.

FlaskList processingStore map
EnerGourmet pairing interface

AI energy-drink sommelier

EnerGourmet

A deliberately serious pairing assistant that recommends — and warns against — energy-drink flavours for a meal.

FlaskGeminiBilingual

Lab rules

Useful. Specific. Alive.

01

Solve a recognisable problem

A lab project may be odd, but its use should be clear within a sentence.

02

Make the interaction visible

Maps, networks and live recomputation turn abstract logic into something you can understand at a glance.

03

Keep some personality

A useful tool can still be warm, witty or confidently over-specific.

The wider workshop

Looking for games or production software?

Vitya Games and Vitya Soft have their own focused homes, all connected through the Markus Viktor index.

Open all collections